Rising to new heights - village of howard tag line
Village of Howard, WI Village of Howard, Wisconsin

CURRENT PROJECTS


Road Closure

Planholder List and Bid Tabs 2011


Project 10022D
HWY 29/Packerland Utility Relocations

Bid Tab 1-A (Updated: 8/22/2011)
Bid Tab 1-B (Updated: 8/22/2011)
Bid Tab Summary (Updated: 8/22/2011)

Plan List (8/12/2011)


Project 11009
2011 Brookfield Avenue Utility Extensions

Bid Tab 1-A (Updated: 7/27/2011)
Bid Tab 1-B (Updated: 7/27/2011)
Bid Tab 1-C (Updated: 7/27/2011)

Bid Tab Summary (Updated: 7/27/2011)

Project 11008
2011 Street Resurfacing, Akzo Nobel Parking Lot Construction and Glendale Avenue Bridge Repair

Bid Tab (Updated: 3/28/2011)

Bid Tab Summary (Updated: 3/28/2011)



Project 10022A
Highway 29 Utility Relocations - Dousman/Shawano Watermain

Bid Tab schedule 1-b (Updated: 3/1/2011)

Bid Tab Summary (Updated: 3/1/2011)

Bid List (Updated: 2/28/2011)

Addendum 1 (Updated: 2/28/2011)

Addendum 2 (Updated: 2/28/2011)

Addendum 3 (Updated: 2/28/2011)



Project 10022B
Highway 29 Utility Relocations - South Frontage Road/Parkside Court sanitary sewer and watermain project


Bid Tab (Updated: 3/1/2011)

Bid List (Updated: 3/1/2011)

Addendum 1 (Updated: 2/28/2011)

Addendum 2 (Updated: 2/28/2011)

Addendum 3 (Updated: 2/28/2011)


Project 10022C
Highway 29 Utility Relocations - CTH J/Riverdale Drive sanitary sewer watermain


Bid Tab (Updated: 3/2/2011)

Bid List (Updated: 3/1/2011)

Addendum 1 (Updated: 2/28/2011)

Addendum 2 (Updated: 2/28/2011)



Velp Avenue Reconstruction

This project will reconstruct Velp Avenue from Military Avenue to Memorial Drive to replace worn pavement and sewer systems. The road will be constructed as a four-lane undivided roadway with a partial grass median installed near the Military Avenue and Melody Drive intersections. Sidewalk and ten-foot wide grass terraces (between the roadway and the sidewalk) will be installed on both sides of the roadway. Roundabouts will be installed at the Military Avenue and Memorial Drive intersections. Velp Avenue will remain open to traffic during construction, but it will be reduced to a single travel lane in the widened roadway footprint and intersection modifications. Impacts and modifications to existing driveways along the project are expected.


Project Schedule

June-Aug. 2010:
Utility Construction

July-Oct. 2010:
Utility Line Relocation

April-Oct. 2011:
Roadway Construction
BEFORE RECONSTRUCTION
AFTER RECONSTRUCTION


NOTE: All projects plans on this page are preliminary plans and are subject to change.
2456 Glendale Avenue, Green Bay, WI 54313 - 920/434-4640- email: pfevert@villageofhoward.com - myVILLAGE